Plenums are air compartments or chambers that are sometimes found in buildings, either above suspended ceilings, in the gap between the ceiling and the floor slab, or below raised floors in the gap between the raised floor and the floor slab. They form part of the ventilation system for the building.
They may be supply or return plenum, and may serve either an entire building, or a specific zone in a building. Supply plenum supply ventilation air to the occupied space, whilst return air is generally extracted through ductwork. Conversely, in return plenum the air is generally ducted to the space, whilst the return air is extracted through the plenum.
Plenum can be combined with thermal mass to help moderate peak conditions, or to allow night time purging. See thermal mass for more information.
Underfloor air distribution (UFAD) uses the underfloor plenum beneath a raised floor to provide ventilation air through floor diffusers directly to the occupied zone. The air spreads across the floor forming a reservoir of fresh, cool air. Any sources of heat (such as people or computers) generate a thermal plume lifting contaminated air to high level where it can be removed from the space. See Underfloor air distribution for more information.
Plenum can give good flexibility for the layout of buildings. However, they can provide a space within which fire can spread, particularly because of the air supply they offer, and so they may be required to include fire and smoke detection, and potentially combustible material (such as cables) may be controlled. They can also create a pathway for the transmission of sound between separate spaces.
The inclusion of dampers and acoustic attenuators can be beneficial, but this results in pressure losses. Good air-tightness is required to the plenum construction to optimise performance.
It is important to ensure that spaces above suspended ceilings and below raised floors do not inadvertently become plenum as a result of the disconnection of, or damage to ductwork.
NB the phrase ‘open plenum’ can be used to describe buildings in which there is no suspended ceiling, but instead the floor slab and services are exposed giving an ‘industrial’ look.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- Active thermal mass.
- Air handling unit.
- Chilled beam.
- CIBSE Case Study Olympic Velodrome.
- CIBSE Case Study Ortus Learning and Events Centre.
- Ground preconditioning of supply air.
- Herringbone strut.
- HVAC.
- Floating floor.
- Floor plenum airtightness.
- Mechanical ventilation.
- Night time purging.
- Raised floor.
- Sprung floor.
- Suspended ceiling.
- Thermal labyrinth.
- Thermal mass.
- Underfloor air distribution
- Ventilation.
Featured articles and news
Homes England creates largest housing-led site in the North
Successful, 34 hectare land acquisition with the residential allocation now completed.
Scottish apprenticeship training proposals
General support although better accountability and transparency is sought.
The history of building regulations
A story of belated action in response to crisis.
Moisture, fire safety and emerging trends in living walls
How wet is your wall?
Current policy explained and newly published consultation by the UK and Welsh Governments.
British architecture 1919–39. Book review.
Conservation of listed prefabs in Moseley.
Energy industry calls for urgent reform.
Heritage staff wellbeing at work survey.
A five minute introduction.
50th Golden anniversary ECA Edmundson apprentice award
Showcasing the very best electrotechnical and engineering services for half a century.
Welsh government consults on HRBs and reg changes
Seeking feedback on a new regulatory regime and a broad range of issues.
CIOB Client Guide (2nd edition) March 2025
Free download covering statutory dutyholder roles under the Building Safety Act and much more.
Minister quizzed, as responsibility transfers to MHCLG and BSR publishes new building control guidance.
UK environmental regulations reform 2025
Amid wider new approaches to ensure regulators and regulation support growth.
BSRIA Statutory Compliance Inspection Checklist
BG80/2025 now significantly updated to include requirements related to important changes in legislation.